Specification guide

Lot Traceability for Mil-Spec O-Rings

You check lot traceability on O-rings for a defense contract on paper: the lot number on your supplier's certificate of conformance has to lead back, through the manufacturer's certificate and the cure date, to the company that molded the parts, with every seller in between named. What that paper must contain is set by the clauses and quality requirements in your contract, not by the O-ring's part number. On DLA awards, procurement note C03 has the seller confirm it holds supply chain traceability documentation naming the part number, the manufacturer and its CAGE code, every intermediary and, when available, the lot code. The counterfeit-part clauses buyers often quote, DFARS 252.246-7007 and 252.246-7008, cover electronic parts, not seals; for an O-ring the counterfeit reporting duty comes from FAR 52.246-26 when the contract carries it.

The chain a buyer checks

  1. The supplier's certificate of conformance: part number, specification, manufacturer, lot and quantity, signed and dated.
  2. The manufacturer's certificate for the same lot and the same document, which ships with a specification part.
  3. The cure date, given as a quarter and a year, against the age limit on your order (shelf-life guide).
  4. The package: where MIL-STD-129 applies to a shelf-life coded item, the unit pack carries the cure date as a quarter and the last two digits of the year, and the lot number sits on the unit, intermediate and exterior packs. The lot and date on the bag should match the paper.
  5. The sellers in between: if the parts passed through a distributor, the chain of invoices or authorizations back to the manufacturer.
  6. Where the document has a qualified products list, the manufacturer on the certificate against the listed source (how to check a QPL).

Keep the set together with your receiving record, because a later request asks for all of it at once.

Which clauses apply to an O-ring

Federal and DLA requirements a defense O-ring order can carry, what each asks for, and whether it reaches a seal
RequirementWhat it asks forDoes it reach an O-ring?
FAR 52.246-2, Inspection of Supplies, Fixed-PriceAn inspection system, records of the inspections kept available for as long as the contract requires, and the government's right to inspectYes, where it is in the contract
FAR 52.246-11, Higher-Level Contract Quality RequirementThe quality standard the contracting officer writes in; flows to subcontracts for critical and complex itemsYes, when a standard is named
FAR 52.246-15, Certificate of ConformanceA signed certificate in place of source inspection, in prescribed wording, when authorized in writingYes, when the contracting officer uses it
FAR 52.246-26, Reporting Nonconforming ItemsScreen GIDEP reports; report counterfeit or suspect counterfeit items of any kind within 60 daysYes, when in the contract; it names any part or material, and it is not flowed to subcontracts for commercial products
DFARS 252.246-7007 and 252.246-7008Counterfeit detection and sourcing rules for electronic parts: integrated circuits, discrete electronic components and circuit assembliesNo; a seal is not an electronic part
DLA procurement note C03Supply chain traceability documentation, produced on request and retainedYes, on DLA awards, for any item
MIL-STD-129 markingCure date and lot number on the packs of shelf-life coded itemsYes, when the order invokes it
SAE AS6174B, Counterfeit MaterielAn authenticity plan, reliable sources, traceability and inspection for materiel of any typeOnly when your contract or purchase order invokes it

What DLA asks a non-manufacturer to hold

The June 2023 version of procurement note C03 says that by quoting, the seller confirms it has, or will have before delivery, documentation showing the item conforms and, for a part-numbered item, comes from an approved manufacturer. The documentation names the item, the part number, the drawing or specification, the national stock number, the manufacturer and its CAGE code, and every intermediary between the manufacturer and government acceptance, plus the manufacturer's lot or date code when one exists. The seller produces it within three business days of a request and keeps it for ten years after final payment; the June 2020 version still printed in DLAD 4.703 says six years, so read the version your solicitation cites. DLA's published examples accept, from an authorized distributor, its distributor agreement or a letter of authorization from the approved source, and from other sellers, the invoice or packing slip from the approved source or its authorized distributor. DLAD 11.392 tells contracting officers to confirm that trail and to reject redacted documents.

Counterfeit prevention for seals

FAR 52.246-26 defines a counterfeit item as an unlawful or unauthorized reproduction, substitution or alteration knowingly misrepresented as the original manufacturer's authentic item, and its reporting duty covers any end item, component, part or material. GIDEP, the Government-Industry Data Exchange Program, is where those reports and other nonconforming-part notices are shared between government and industry members. For non-electronic materiel such as seals, the SAE standard is AS6174B (revised February 2026); AS5553 covers electrical, electronic and electromechanical parts, and AS6496 electronic parts in authorized distribution. DLA's qualified distributor lists (QSLD) cover semiconductors, microcircuits, connectors and certain hardware, not packing and gasket items. Conquest's own supplier clauses bar counterfeit and suspect counterfeit goods and any removal of a previous seller's identification (see the supplier requirements page).

What the Conquest paperwork gives you

A certificate of conformance ships with every order and names the part number, the specification, the manufacturer, the lot, the quantity and the manufacturer's cure date. The manufacturer's own certificate ships with specification parts, and the batch test report where the program requires it and the manufacturer issues one. Conquest can also supply the manufacturer's certification on the raw material, or from the maker of the finished part. Conquest's purchase orders to its own suppliers require batch and cure dates on all items. If your contract carries C03 or another traceability requirement, say so on the request and name the documents you need.

Conquest keeps its certificates permanently for customers whose contracts require it and for 15 years for everyone else, and its digital records, kept from 2020 on, are retained indefinitely. A contract that sets its own period, such as the ten years in C03, belongs on the purchase order.

What to put on the purchase order

  • The part number and the specification with its revision
  • The traceability documents you need, by name, and how long you need them kept
  • The manufacturer's certificate for the lot, and the lot number on the supplier's certificate
  • The cure-date age limit and any MIL-STD-129 marking requirement
  • Any quality or counterfeit standard your prime contract flows down, such as AS6174B

Send it with the callout through the quote form, and a person replies within one business day.

Sources

  1. FAR 52.246-2 (Aug 1996), 52.246-11 (Dec 2014), 52.246-15 (Apr 1984) and 52.246-26 (Aug 2024), with FAR 46.317 and 46.504, acquisition.gov, read 2026-09-24
  2. DFARS 252.246-7007 and 252.246-7008 (Jan 2023) and DFARS 246.870, acquisition.gov, read 2026-09-24; scope unchanged in DoD Class Deviation 2026-O0035 (FAR overhaul, Part 246)
  3. DLAD Procurement Notes, effective 30 April 2025, note C03, Contractor Retention of Supply Chain Traceability Documentation (JUN 2023), dla.mil (archived copy), read 2026-09-24; DLAD 4.703 and 11.392, acquisition.gov
  4. DLA Land and Maritime, Supply Chain Traceability Documentation Requirements and Examples (Counterfeit Detection and Avoidance Program), dla.mil (archived copy), read 2026-09-24
  5. DLAD 9.202 and the DLA Troop Support Qualified Suppliers List page (QSLD and QSLM scope), read 2026-09-24
  6. MIL-STD-129R with Change 2 (27 September 2019), Military Marking for Shipment and Storage, sections 5.10.1 and 5.10.13, read 2026-09-24
  7. SAE AS6174B (2026-02-17), AS5553E (2025-11-13) and AS6496 records on SAE Mobilus, title, revision and scope only, read 2026-09-24
  8. Government-Industry Data Exchange Program description, DIAR 1446.170, acquisition.gov, read 2026-09-24
  9. Procurement Quality Clauses F-840-005-F, revision 1/26, Conquest Seal: clause 16 and the purchase-order line on batch and cure dates
  10. Conquest Seal, company statement of 2026-09-24: the manufacturer's cure date printed on its certificate of conformance, and its record retention (certificates kept permanently where a customer's contract requires it, 15 years otherwise; digital records, kept from 2020 on, retained indefinitely)

Frequently asked questions

Do DFARS 252.246-7007 and 252.246-7008 apply to O-rings?

No. Both clauses define their scope as electronic parts: integrated circuits, discrete electronic components and circuit assemblies. An O-ring's counterfeit reporting duty comes from FAR 52.246-26 when the contract carries it.

What documents prove traceability for a mil-spec O-ring?

The supplier's certificate naming the manufacturer and the lot, the manufacturer's certificate for that lot, the cure date, and the invoices or authorizations that connect every seller back to the manufacturer.

How long must traceability documents be kept?

Whatever your contract says. On DLA awards, the June 2023 version of procurement note C03 says ten years after final payment; the older June 2020 version says six. Conquest keeps its own certificates permanently where a customer's contract requires it and 15 years otherwise.

Where does the cure date appear?

On the manufacturer's paperwork, on the Conquest certificate of conformance and on the package. Where MIL-STD-129 applies, it is marked as a quarter and the last two digits of the year, for example 3Q26.

Does buying through a distributor break the chain?

Not if each hand-off is documented. DLA's own examples accept an authorized distributor's agreement or authorization letter, or the invoice from the approved source or its authorized distributor.

Do I have to report a counterfeit O-ring?

If FAR 52.246-26 is in your contract, yes: to the contracting officer in writing within 60 days, and to GIDEP, with the exceptions the clause lists.

Send the part number and we quote it

Part number or drawing, compound if you know it, and the quantity. A Conquest representative replies, not an auto-responder.

Request a quote
Request a quote